PROJECT DETAILS
Start date:
Finish date:
EPC Contractor:
Nov 2020
July 2021
Ktistor Energy
photovoltaic park, kozani
The project was done in Greece in the area of Sidera Kozani. It had a power of 40 MW, 97,448 panels and was implemented in 2021. The General Contractor was KTISTOR Energy.
Sythn3sis undertook:
- all drilling works in hard rock
- placement of piles in concrete (cast-in-method)
- the assembly works for the steel structure.
- placement of photovoltaic panels.